Civil Engineering

Glass Bottle

Glass Bottle is a completely new city quarter development. Its creation will transform the former 37-acre Irish Glass Bottle site into a new sustainable urban neighborhood with over 3,800 apartments, 1 million square feet of commercial space, vibrant community amenities, schools, parks, and open spaces. It connects Dublin to the bay and links the neighbouring […]

Glass Bottle Read More »

Broombridge Luas Depot

New Luas extension and consists of two new buildings to service the Luas trains which will operate on the newly constructed line. M&N excavated approx 5,000m3 material off site. M&N carried out all the substructure works for new Luas buildings. Site services drainage, ducting all carried out by M&N. M&N completed all the external works

Broombridge Luas Depot Read More »

PDM Infrastructure Upgrade

Extension & Infrastructure works at existing Waste Water Treatment Facility in PDM. Attenuation pond construction and disposal on site. Earthworks including Soil stabilisation. Disposal 10,000m3 material off site. Drainage/service works in existing live treatment plant area. Carefully working and exposing around live services.

PDM Infrastructure Upgrade Read More »

substation, electricity, current

ESB Substation 110KVA

• New 110kva substation & associated Switchrooms. • Reduce Level strip & Disposal Off Site 12,000m3 Greenfield Inert. Rock Breaking 2,500m3 • Site Prep bulk filling Hardcore. • Pad/Raft Foundations & Bulk Filling Lean mix. • Filling floors to grading levels and installing internal Drainage/Radon & Pop Ups. • ESB Ducting as per ESB spec.

ESB Substation 110KVA Read More »