Civil Engineering

Hollystown – Foul Drainage Works

Our PSCS role included the construction of a 3.2-kilometer foul drainage line, manholes, and associated drainage systems, all compliant with Irish Water (IW) standards. The depths reached up to 8 meters, necessitating rock breaking in trenches amounting to 4,500m3 at significant depths. The initial phase involved setting up the compound and site facilities to accommodate …

Hollystown – Foul Drainage Works Read More »

fiber, cable, connection

Virgin media FTTH Product

Installing broadband services in East Leinster region for number towns. Works included ducting works in public footpaths/roadways and connections to local houses in estates. Reinstatement works and disposal surplus material off site. Traffic management works. Liaising with public residents during works.

Broombridge Luas Depot

New Luas extension and consists of two new buildings to service the Luas trains which will operate on the newly constructed line. M&N excavated approx 5,000m3 material off site. M&N carried out all the substructure works for new Luas buildings. Site services drainage, ducting all carried out by M&N. M&N completed all the external works …

Broombridge Luas Depot Read More »

PDM Infrastrurce Upgrade

Extension & Infrastructure works at existing Waste Water Treatment Facility in PDM. Attenuation pond construction and disposal on site. Earthworks including Soil stabilisation. Disposal 10,000m3 material off site. Drainage/service works in existing live treatment plant area. Carefully working and exposing around live services.

Greystones Marina

Gresytones Harbour Development works. Associated substructure works for new Club Houses. 1km of deep drainage (4m deep). Deep attenuation tanks. Temp works sheet piling. Traffic management. Service tie-ins involving 300m of road opening with associated traffic management measures put in place along busy Greystone road. M&N provided Coastal works along beach to prevent coastal erosion. …

Greystones Marina Read More »

Dublin Zoo New Gorilla Habitat

Project entailed converting Rhino habitat into a Gorilla habitat for Dublin Zoo. 300m RC retaining wall excavation & blinding. Extensive earthworks (circa 10,000m3). Gorilla holding building of 700m2 (groundworks) with associated services.

IDA Windyhall Carpark Extension

• Project consisted of a 4.5 Hectare extension to IDA carpark. • Bulk excavation, 2,000m3 & disposal on site. • M&N encountered rockbreaking during construction. • 300 metres of adoptable road, including all the associated site services.