DUB 68 / 78

Project Name

DUB 68 / 78

Client:

Confidential

Sector:

Private

Location:

West Dublin

Main Contractor:

PJ Hegarty

Contract Period:

October 2023 To February 2023

  • Two new Data Centres with a combined footprint of 50,000m2.
  • Site Strip and disposal of Circa 50,000m3 inert material offsite
  • Excavation of Substructures consisting of pad and strip foundations (18,000m3)
  • Deep line drainage reaching 8.00m depths consisting of 375mm-1200mm diameter pipe lines
  • 44 kilometres of ducting to be installed, consisting of MV, LV and Fibre
  • Breaking 20,000m3 of rock within trenches and substructures
  • Completion of Roads, Paths and Paving around new data centres