Data Centre

Data Centre – DUB058

New Data Centre 24,000m2 building. Site strip and disposal of 70,000m3 greenfield inert to licensed tips. Substructures, Pad foundations & bulk filing leanmix. Deep line drainage 375-1200 dia pipes SW/FW ranging from 5m-8m deep. Rock breaking circa 15,000m3 for trenches. Temporary works. Connections to local park services. Providing New entrance onto existing park. Attenuation pond […]

Data Centre – DUB058 Read More »

Project Gemini

Extension to existing data centre. M&N done all enabling works including demolition/alterations of existing site structures & services. M&N removed circa 8,000 m3 material off site. M&N carried all substructure works to building. All Site infrastructure works by M&N. Working in live data centre environment. Landscaping & External works to new data centre extension.

Project Gemini Read More »

Data Centre Phase 4 DUB07/08

• 32,000m2 New Data Centres to existing Campus • Bulk Excavation & Disposal Off Site 50,000m3 Greenfield Inert. Rock Breaking 6000m3 • Site Prep bulk filling Hardcore & laying Terram. • Pad Foundations & Bulk Filling Lean mix and backfilling on completion. • Filling floor to grading levels and installing internal Drainage/Radon & Pop Ups.

Data Centre Phase 4 DUB07/08 Read More »

substation, electricity, current

ESB Substation 110KVA

• New 110kva substation & associated Switchrooms. • Reduce Level strip & Disposal Off Site 12,000m3 Greenfield Inert. Rock Breaking 2,500m3 • Site Prep bulk filling Hardcore. • Pad/Raft Foundations & Bulk Filling Lean mix. • Filling floors to grading levels and installing internal Drainage/Radon & Pop Ups. • ESB Ducting as per ESB spec.

ESB Substation 110KVA Read More »

Data Centre Phase 3 DUB06

• New Data Facility 21,000m2 building. • Reduce level strip and disposal 55,000m3 Greenfield Inert to licensed Tip. Rock breaking 6,000m3 for site prep. • Site Prep & Bulk Filling Hardcore. • Substructure pad foundations & bulk filling lean mix.Rock breaking 3000m3 for pads. • Internal Grading Floors & Perimeter Ground Beams. Internal Drainage &Pop

Data Centre Phase 3 DUB06 Read More »

IBM Conversion Project

Project was to convert an existing manufacturing facility to office space, in a live secure campus environment. Working in live environment safety paramount. M&N installed new drainage, internal and external. Substructure works; pad foundations for new internal mezzanine floor, RC wheelchair escape ramps. External works, RC bunded plinths, foundations and RC support structures for new

IBM Conversion Project Read More »

Data Centre Phase 2 DB5

• New Data Facility 15000m2 building. • Reduce level strip and disposal 30,000m3 Greenfield Inert to licensed Tip. Site Prep & Bulk Filling Hardcore. • Substructure pad foundations & bulk filling lean mix. Rock breaking 2000m3 for pads. • Internal Grading Floors & Perimeter Ground Beams.  Internal Drainage &Pop Ups/ Radon system. • Storm/Foul Drainage

Data Centre Phase 2 DB5 Read More »

Data Centre Phase 1 DB4

New Extension to Existing Data Facility 8000m2 Reduce level strip and disposal 6,000m3 Greenfield Inert to licensed Tip. Site Prep & Bulk Filling Hardcore. Substructure pad foundations & bulk filling lean mix. Internal Grading Floors & Perimeter Ground Beams. Internal Drainage &Pop Ups/ Radon system. Storm/Foul Drainage. Deep Petrol Interceptors. Temporary Works. Ducting LV/COMMS/MV Power

Data Centre Phase 1 DB4 Read More »