Commercial

The Frame

M&N scope of works included: Completion of demolition works on site to basement walls and floor slabs Importing of 500m3 of piling matt Pile attendance for the duration of piling works Installation of groundforce flying shores Bulk excavation and removal off site of 16,000m3 of material including 3,000m3 of contaminated Material. This project was undertaken […]

The Frame Read More »

Project Kells

Bulk excavation of approximately 25,000m3 for 8 metre deep basement. This was a very logistically challenging project due to its location right in the heart of Dublin and the site Access via Dawson Street and Duke Lane and with the Luas on Dawson Street and the Pedestrian Foot fall of Grafton Street and Dawson Street.

Project Kells Read More »

National Train Control Centre

M&N carried out excavation & civil works for Irish rail new National Train Control Centre (NTCC) on a brownfield site. Works involved partial basement dig, removal of contaminated material off site to licensed tips. Substructure works included, piling breaking & disposal, installation of blinding, back filling to basement slab walls. M&N completed basement slab drainage

National Train Control Centre Read More »

Spencer North

Development for Hotel/Apartments at Spencer North Dublin. Bulk Dig 25,000m3 brownfield site. Disposal of over 50,000 tonnes contaminated material for export to barges and licensed facilities in Ireland. M&N achieved over 100 artic loads per day at height of project. Piling attendance on Piling contractor and disposalof Pile arisings off site. Substructures – Blinding, Breaking

Spencer North Read More »

Fibonacci Square

Facebook New International Headquarters. Two storey basement dig within secant piled wall 15.00m deep. Approx 135,000m3 excavated & disposed off site brownfield site within 28 week programme duration. M&N achieved on average 130 artic loads per day at height of project in busy City Centre environment. M&N disposed circa 30,000 tonnes contaminated material for export

Fibonacci Square Read More »

TC2 Cherrywood

Groundworks for 384 Apartments and single storey basement carpark. M&N works included bulk dig 35,000m3 of mostly inert soil and disposal off site. Piling attendances to piling contractor during Piling phase. Substructure works, breaking 600& 900 dia piles, blinding works, backfilling basement wall. Under slab drainage. FW/SW Drainage & Site services works. Working closely alongside

TC2 Cherrywood Read More »

ESB New HQ

New ESB Headquarters. Two Storey Basement dig 8.00m deep, approx 72,000m3 excavation brownfield site. M&N achieved on average over 100 artic loads per day during bulk dig. Rock breaking 24,000m3 & disposed off site. Complex dig due to obstructions in ground reinforced concrete which had to be broken out from existing building. Disposal 60,000 tonnes

ESB New HQ Read More »

Charlemont Square

A mixed used development double storey basement dig 8.00m deep brownfield site. M&N excavated approx 130,000m3 material and disposed off site. Temporary works – M&N installed propping to perimeter basement. M&N achieved over 130 artic loads per day at height project. Substructure – Blinding works carried out. Sub slab drainage & In slab drainage works.

Charlemont Square Read More »

Scroll to Top