Spencer North
Development for Hotel/Apartments at Spencer North Dublin. Bulk Dig 25,000m3 brownfield site. Disposal of over 50,000 tonnes contaminated material for export to barges and licensed facilities in Ireland. M&N achieved over 100 artic loads per day at height of project. Piling attendance on Piling contractor and disposalof Pile arisings off site. Substructures – Blinding, Breaking …
Fibonacci Square
Facebook New International Headquarters. Two storey basement dig within secant piled wall 15.00m deep. Approx 135,000m3 excavated & disposed off site brownfield site within 28 week programme duration. M&N achieved on average 130 artic loads per day at height of project in busy City Centre environment. M&N disposed circa 30,000 tonnes contaminated material for export …
TC2 Cherrywood
Groundworks for 384 Apartments and single storey basement carpark. M&N works included bulk dig 35,000m3 of mostly inert soil and disposal off site. Piling attendances to piling contractor during Piling phase. Substructure works, breaking 600& 900 dia piles, blinding works, backfilling basement wall. Under slab drainage. FW/SW Drainage & Site services works. Working closely alongside …
ESB New HQ
New ESB Headquarters. Two Storey Basement dig 8.00m deep, approx 72,000m3 excavation brownfield site. M&N achieved on average over 100 artic loads per day during bulk dig. Rock breaking 24,000m3 & disposed off site. Complex dig due to obstructions in ground reinforced concrete which had to be broken out from existing building. Disposal 60,000 tonnes …
Charlemont Square
A mixed used development double storey basement dig 8.00m deep brownfield site. M&N excavated approx 130,000m3 material and disposed off site. Temporary works – M&N installed propping to perimeter basement. M&N achieved over 130 artic loads per day at height project. Substructure – Blinding works carried out. Sub slab drainage & In slab drainage works.
Chatham Court
New Office/Retail development. M&N excavated double storey basement 12.00m deep dig in a tight city centre site off Grafton street. Volume excavation was 12,000m3 all removed by Tipper trucks. M&N Site logistics team enabled all this material to be removed safely and efficiently through proper planning and coordination with relevant stakeholders. Spoil removed to licensed …