Project Category: Residential

Chapel Road Delgany

Site strip 15,000m3 Greenfield inert off site to licensed tip. Site development works carried out for 75 number residential units. Works included Foul/Storm drainage varying in depths from 2.00m – 6.00m deep Construction Attenuation tank, Storm/Foul connections. Site infrastructure roads & associated services. Project also included outside boundary works which included 200metres deep line foul …

Chapel Road Delgany Read More »

Corkagh Grange

Development of 150 Social Housing Units. Site strip & disposal 25,000m3 greenfield inert material. Site infrastructure works including roads, drainage, services, attenuation tank & connections to local services. Site curtilage and substructure works to housing units. Works all in accordance with local authority.

St Helens

Site development & Groundworks for 330 units in Adamstown. Works included site strip & disposal 40,000m3 greenfield inert material on site. Rock breaking 3,000m3 for deep line storm/foul drainage 2.00-5.00m deep. Manholes installed using Perfect Base system by Tracey Concrete. Paving to housing units & public driveways.

Dun Si St Marnocks Bay

Site Development & Groundworks for 150 housing units Station Road Portmarnock. Works included site strip & disposal 65,000m3 Greenfield Inert off site. Substructures for houses and external works. Permeable paving to house driveways. Site Infrastructure works includes SW/FW drainage. Manholes installed using perfect base system by Tracey Concrete. Installation of foul pumping station. Construction for …

Dun Si St Marnocks Bay Read More »

St Teresa’s Gardens Regeneration

New social housing development 50 number units. A fireworks factory once stood on this site which led to site contamination. M&N disposed circa 30,000 tonnes contaminated spoil off site. Works including Site strip 15,000m3 brownfield site, infrastructure works including roads, drainage, services & connections to local authority services outside site boundary. Substructure works, piling attendance. …

St Teresa’s Gardens Regeneration Read More »

Sheehy Skeffington Meadows Tallaght

Development 90 social housing units for SDCC. Site strip excavation of 20,000m3 inert material disposed off site. Substructure works, strip foundations, floors in substructure all in accordance with local authority. Site Infrastructure works, access roads, main drainage, watermains, kerbing, footpaths. External works, drainage, services, landscaping, footpaths, paving. Connections to local services outside site boundary on …

Sheehy Skeffington Meadows Tallaght Read More »

Brickfield Lane Student Accommodation

New Student Block Accommodation within City Centre environment. M&N excavated circa 5,0000m3 material off site. Disposal of contaminated material to licensed facility. Substructure works including blinding, pad foundations, breaking piles and prep pile heads. Piling attendance. External works to courtyard, including drainage, site services, roads, footpaths, paving. External deep line drainage outside site boundary 150 …

Brickfield Lane Student Accommodation Read More »

Dolphins Barn Regeneration

Regeneration of four blocks flats for new development 100nr units. Site strip and reduce level dig of 20,000m3 material disposed off site. M&N disposed of pockets of contaminated material off site. Substructure works, foundation trenches, Site infrastructure works, drainage, services, attenuation tanks, roads. External works to housing units, drainage footpaths, paving, landscaping on completion. Project …

Dolphins Barn Regeneration Read More »

Richmond Road Residential Development

Social Housing development over a basement car park. Alterations of existing services on site, demolition of existing site structures with removal off site. Bulk excavation basement dig in tight city centre site 6.00m dig, circa 15,000m3 material removed off site. Disposal Asbestos material to licensed facility. Substructure works, foundations, piling, blinding, under slab drainage. External …

Richmond Road Residential Development Read More »

The Paddocks Cresent

39 Units ranging from semi d, detached, apartment blocks. M&N completed all associated groundworks for 39 units. Apartment block, M&N completed all first floors in-situ slabs & associated reinforcement & formwork. M&N disposed circa 15,000m3 excavated material off site. M&N completed the substructure & superstructure blockwork, including garden walls & bin stores. Site development works …

The Paddocks Cresent Read More »